
CM STANDARDS MANUAL
By: Frank Watts, BSME, CCM
Ever wished you had the CM Standards
Manual from a Best In Class product manufacturing company? Here
it is! In fact, it is the best of the best practices. With
this tool, satisfy most TQM, ISO, CMP, and DOD process documentation
for Engineering Documentation Control (EDC) / Configuration Management
(CM).
- Includes 86 pages, 45 CM standards derived from the "best
of the best" practices as witnessed by Frank Watts in
his work and consulting experience (over 70 clients).
- Includes generic forms and form instructions and process
work flow diagrams
- Includes a 100 day money back guarantee per the license
agreement
- Includes free telephone consultation on the application
of the product to your process for a period of one year per
the license agreement.
- Helps you take a giant step beyond satisfying ISO/QS/AS
9000 to best in class documentation requirements
- License agreement covers one CM Function only.
Bound in a three ring binder with Your Name & Company
Name
Covers:
General CM Practices
BOM Practices
Release (new item, drawing or product)
Change Request
Change Control
Field Changes
Change Costing
Users Guide
Definitions
Can be purchased with or without an MS Word file of the Standards.
The MS Word File does NOT contain the forms and flow diagrams
which are only in the Hard Copy.
STANDARDS MANUAL CONTENTS
| # |
TITLE |
PAGES |
| 01 |
Policy |
3 |
| 02 |
Writing EDC Standards |
3 |
| 03 |
CM Requirements For Drafting Standards |
2 |
| 04 |
Technical Document Groups |
2 |
| 05 |
Teams For All CM Processes |
2 |
| 06 |
Cognizant Engineers |
2 |
| 07 |
Part Numbers |
1 |
| 08 |
Quantity and Units of Measure |
1 |
| 09 |
Bills Of Material |
1 |
| 10 |
Approved Manufacturers List |
1 |
| 11 |
Deviations |
2 |
| 12 |
Spare Parts |
1 |
| 13 |
Prints / Points of Use / Paper-less |
1 |
| 14 |
Signatures |
1 |
| 15 |
Class Coding / Naming Conventions / Group Technology |
3 |
| 16 |
Tabulated Documents |
2 |
| 17 |
Nameplate and Serial Number |
1 |
| 20 |
Release Policy 20 |
2 |
| 21 |
Teams In Release |
1 |
| 22 |
Phase Release |
2 |
| |
|
|
| 30 |
Change Request Policy |
2 |
| 31 |
Team In Request |
1 |
| 32 |
The Request Form |
1 |
| |
|
|
| 40 |
Change Control Policy |
3 |
| 41 |
Team In Change Process |
1 |
| 42 |
The Change Form |
6 |
| 43 |
Interchangeability |
1 |
| 44 |
Part Number & Revision Level Changes |
2 |
| 45 |
Change Classification |
1 |
| 46 |
Mark Up of Design Documents |
2 |
| 47 |
Effectivity |
2 |
| 48 |
Effectivity Management |
2 |
| 49 |
Disposition of Old Design Parts |
1 |
| 50 |
Impacted / Affected By A Change |
1 |
| 51 |
Change of Field Units |
1 |
| 52 |
Design Complete |
1 |
| 53 |
Actual Effectivity |
2 |
| 54 |
Line Down Change |
1 |
| 55 |
Closing a Change |
1 |
| 56 |
Track Changes |
1 |
| 60 |
Field Changes |
1 |
| 61 |
Field Change Form |
2 |
| 70 |
Costing Design Changes |
2 |
| 80 |
Users Guide / CM Plan |
5 |
| 90 |
Definitions |
7 |
| |
|
|
| 45 |
Total Standards |
86 Total Pgs |
(Top of Page)
BACK TO LITERATURE PAGE
For More Info

EXCEPTIONAL CONFIGURATION
MANAGEMENT HOME PAGE
©1999 EC3 Corp - Copyright material
may be copied from this site for your one time personal use.
Do not reproduce. All rights reserved. Others may visit this
site to obtain a copy.
|